Electrical Engineering maintenance service
Others

1. Detailed Layout drawings of:-
A) Electrical layouts and general arrangement drawings.
B) Hazardous area classification diagram of plans and sections.
C) Electrical location plan.
D) Lightening protection.
E) Earthing protection / grounding.
F) Lighting including road lighting
G) Power.
H) Field panels.
I) Cable Routing. (To show motors push buttons and terminal details)
J) Cable trays / ladder / trenches.
K) Substation and D.G. room to incorporate with equipment.
L) Electrical wiring interface.
M) Supports for electrical.
N) Electrical items mountings and connections drawings.
O) Final As-built drawings

2. Detailed technical Specifications / data sheets / drawings / documents for:-
A) Electrical system in plant.
B) Electrical items.
C) Electrical Nameplate List
D) Electrical panels.
E) Ancillaries / misc. items.
F) Electrical and instrument schedule
G) Cable (power / control / lighting / earthing ) schedules .
H) Lighting distribution schedule.
I) lighting schedule.
J) Power schedule.
K) Lightning protection schedule.
L) Earthing protection / grounding schedule.
M) Switchgear schedule.
N) Electrical Earthing Schematic
O) Electrical and Instrument interface details.
P) Electrical wiring diagrams
Q) Installation of electrical items.
R) Electrical installation procedures
S) Typical installation details drawing.
T) Electrical Pre-commissioning procedures
U) Power distribution for Instrument system.
V) Design of panels, panel wiring and tubing diagrams
W) Termination Details of cabinets, panels and junction boxes/cables
X) Electrical protection coordination final relay settings table.
Y) Interface systems drawings.
Z) Cable trays / ladder / trenches details.
AA) supports for electrical.
AB) Electrical items mountings and connections drawings.
AC) Electrical Hook-up drawings
AD) Enquiry documents for all items.
AE) Carry out technical appraisal of Vendors and recommend suitable Vendors.
AF) Purchase Order indents for all items.
AG) Electrical details / Final quantity
(I) Cables.
(II) Fittings.
(III) Junction boxes
(IV) Cable glands.
(V) Grounding protection & fittings etc.
(VI) Push buttons & socket outlets etc

3. A) Hook-up with system.
B) New single line diagram up to PMCC.
C) MCC/Circuit drawing.